Drew Aldridge 5:00
I mean, look, guys. You guys can negotiate. Maybe you can. Maybe you can’t. But payment terms in your contract are are negotiable sometimes, right? But that’s the only part where you’re actually negotiating. Your payment terms are your payment terms. 30 days, 45 days. However, if you’re talking about that system that you actually want to create to to to have this process move a little bit more seamlessly, this system actually starts with a level of understanding. I mean, I say do things the way we do here at Mobilization Funding. We’ll work with a company and they have 30 day payment terms. We take that with a grain of salt. We actually want to understand that process. When does the actual clock start? So for you guys out there trying to figure out what we mean by that, okay, you finish a month’s worth of work, Scott. Right, you submit your pay app. You’ve done everything required during that tenor during that time of work to submit your pay app. Fully understand when that clock starts. Does it start when you submit the pay app? Does it start when the GC approves the pay app, if if it’s when they approve the pay app, what you need to do is understand how long does it typically take for you to approve a pay application? Okay, five days, right? Five days. What things have to be done on your end to actually approve that pay application? Okay, now it’s approved. It gets submitted to the project owner. What steps need to be taken for them to approve that particular pay application from the general contractor’s side? So understanding that whole process. So don’t plan your projects from a cash flow standpoint based on your payment terms.
Scott Peper 6:36
That’s right. Base it
Drew Aldridge 6:36
on the real payment terms, which involves payment terms plus the lead time on that entire process.
Scott Peper 6:44
And Drew, for heaven’s sake, the invoice date is not when the pencil copy is due. No, it’s not the 20th, estimating out to the 30th.
Drew Aldridge 6:53
No, it
Scott Peper 6:54
is required to do that in many cases, but that invoice date does not count till the end of the month. The last day of work is done, and you have now certified your final copy. That is the date the invoice starts, and so we’ve seen a lot of contractors make mistakes thinking they’re going to bill on the 20th and get paid on the 20th of the next month. That is not the case. You’re billing on the 20th, a pencil copy for work completed through the end of the month, or you estimate complete, but your invoice is not final until the 31st or the first of the
Drew Aldridge 7:22
next month. All right, I think we I think we got that one pretty good. All right, Scott. Myth number two: the low bid is the best deal. Everyone knows the cheapest number isn’t always the best value, yet it still wins most of the time in a lot of our trades. Right, a lot of our customers. What does a sub default actually cost a general contractor, and what should general contractor contractors be looking at beyond just the price?
Scott Peper 7:51
Well, the direct answer is a widely studied, a widely cited study states that a default for a subcontractor will cost the GC anywhere between one and a half to three to three times the scope of work.
Drew Aldridge 8:08
What what drives that? What drives that cost?
Scott Peper 8:10
Well, two things. One, the mistakes and issues that need to now get fixed, depending on when it happened in the problem. If it’s an underbid problem, you still have all that cost that needs to go associated. You could have extra costs in duplicative materials and labor, and then on top of that, when they default and you have to replace them, the typical labor and or materials that come back in usually have anywhere between a 25 to 30% premium, if not more, over and above whatever you were going to get from that new sub if they bid it from the start,
Drew Aldridge 8:43
yeah,
Scott Peper 8:43
because you got to clean up someone else’s work,
Drew Aldridge 8:45
yeah.
Scott Peper 8:46
So what do you do about that? Why do the low bids look? Construction’s expensive, margins are tight, everything wants to be done for cheaper. Material costs are going up, so costs matters. But I would challenge you to think, cost the lowest price with guaranteed performance
Drew Aldridge 9:04
is the
Scott Peper 9:05
best bid. The lowest price with guaranteed performance. So what does that mean? You can’t guarantee performance, but you can look at the subs that you work with. Look at the trade partners you work with, who consistently deliver time and time and time again, deliver the project on time. Deliver the project on budget. Deliver the project with the right quality. Pick and you have two or three of those subcontracts, and you pick the cheapest price. No problem. The problem exists is when you’re doing that, and then you take the new number from the sub that you’ve never worked before. You don’t know what their value is, and they have the lowest price. And then you move your steady trade partners down to that new price point, because really, why would you do that? Well, you just want because you want to make more money. But the reality is that money you think you’re going to make, if they can’t execute and perform to that level, you’re never going. Make it anyway, or you’re just going to cause stress. So the key thing is performance first. Then what’s the lowest price that you know you can get a guaranteed certain quality outcome?
Drew Aldridge 10:11
Yeah. Now every project’s a little different. Maybe every project doesn’t need to be you know a 10 out of 10 perfection quality. You’re not building a fancy hotel, for example, maybe you’re building a you know student housing. Okay, fine. Move your sub partners around in those areas. That’s not a problem either. But that’s the most important thing, I think. Yeah, yeah. I I guess the last thing I would add to that is if you choose to compete on price, then you damn near better have absolutely flawless operations because any inefficiency, any mistake, cuts into a margin that is already razor thin, and that hurts your company exponentially enterprise wide. So if you compete on price, operate efficiently, effectively, and reliably.
Scott Peper 11:00
Yeah, and I can tell you this much: even if you are competing on price, what we see at mobilization funding all the time is if subs start, like if they’re awarded a project and their success exists because they have the right amount of money in their bank account at the exact time they were awarded and at the exact time that this project starts, then you’re already you’re already up the creek. You’re already have way too much risk, so it doesn’t rely on that. The subs that plan ahead and the GCs that allow that to happen, for the subs to know they have the right amount of money, whether it’s financing, whether it’s cash on hand, whether it’s available lines of credit that they already have, so that they can execute and then proper terms according to that. Regardless, sometimes those terms might not be. I can’t change when you get paid. I can’t change how often you get paid. But I can help you have the money you need to execute the project, so you can wait to be paid when I am going to be paid. Those contractors, GCs, and subs always perform the best.
Drew Aldridge 11:54
Yeah,
Scott Peper 11:55
because they have the money they need.
Drew Aldridge 11:56
Yeah, yeah. I mean, when you’re in a more stable, more kind of liquid financial position that just opens up options for you, and then you can actually then compete on price. Because if you’re building that balance sheet, you’re presumably operating effectively and efficiently, and preserving that margin and reducing that that that mar that margin of error is acceptable to you, right? And and you get to you get to really lean in on on price. All right, the last myth myth myth number three: a sub using outside financing must be in trouble. Some GCs still see project financing as a warning sign. The data points to the the data points another way. Why is the best run sub often the one that planned its capital before the job started?
Scott Peper 12:48
All right. If you asked me this question 10 years ago, I had a little different answer. Five years ago, I would have had a little bit different answer, and now I’m going to give you a little different answer too because I think it plays into a few different things. So I’m going to start with the 10 year old answer. The 10 year old answer is still true today. Subs too often are selling their jobs way too thin. Why does that happen? I honestly believe I don’t think they think they’re selling them as thin as they are. I think they they just don’t have good access to numbers. They’re not paying attention to what their real costs are, particularly their overhead, and they’re also not accustomed to what am I actually executing my work at margin wise? I bid it at 20, but am I actually executing it when I’m all said and done paid? Is it 20? When I overlay my overhead onto it and I think it’s 10%, is it really 10% or is it 18%? Those are one issue right there. The second issue is, I think, too often, merchant cash advances and factoring companies are ruining construction financing because they are particularly leveraging and utilizing the general contractors’ creditworthiness and the project money to secure themselves when something goes wrong. Neither one of them are giving the subcontractor the money when they actually need it and making sure the project’s okay. Neither one of them are making sure the money stays on the job or is coordinating the job. There’s a few, very few, and the exceptional construction factors out there know who they are, but there I can count them on less than one hand. Outside of that, when something goes wrong, they send their verifications to the GC. They bombard the GCs with phone calls: “Is the payment coming? Is the payment coming? Is the payment coming?” They create so much anxiety around the general contractor releasing payment to the sub that their anxiety is what creates the anxiety and then hurts the subcontractor.
Drew Aldridge 14:46
Yeah, I mean, like you said, there are factors out there that are useful for in the construction space. Correct. One thing that I’ve noticed about factors that they do not take into account is the velocity of work on construction jobs, regardless. Of what trade you are in changes through the course of the project. So if you get through a month worth of work and you submit an invoice for X amount of dollars and get a factor advance on that, you know you factor that receivable, and you need that cash to fund the work for the next month, but the work the next month. You’re actually like, I’m rolling, right? I’m doing really well. I’m going to do more work. Or the GC is telling me to work faster, add more crews. Costs go up. Then you don’t have enough cash, you know, theoretically to actually fulfill that work from a cash perspective.
Scott Peper 15:35
That’s right.
Drew Aldridge 15:35
Versus a facility that actually matches cost need to the time to the amount on the day, exact, et cetera, like in a contract financing sort of scenario.
Scott Peper 15:44
There was also another widely studied report that said subcontractors who get project financing before the project starts are 25% more successful, and they also are more profitable. And why is that? Because exactly what you just said the velocity of the projects, the timing of the projects, when you can get on a job and get all the work done in the most efficient manner. You’re saving cost,
Drew Aldridge 16:08
yeah.
Scott Peper 16:09
And you need money to be able to do that.
Drew Aldridge 16:11
Yeah, and and that’s
Scott Peper 16:12
that right there.
Drew Aldridge 16:14
I mean, I have they’re also realizing more profit earlier. This the timing of the profit, right? So I mean, for example, I wrote some notes down here. If you have a $10 million job, for example, right, and you have 10% retainage, that’s a million dollars worth of retainage. You have $200,000, and let’s say you make 20 20% gross margins. I’m just round number out there. $200,000 of that profit you will not realize for six months, a year after the project, the project finishes. So you have a millionaire of profit that you’re going to realize during the project. However, if you don’t go out and get financing, you might need $2 million just to get the cash flow even on the project. You might need $2 million out of your operating account to put on the job, but yet you’re receiving 1.8 million dollars pre retainage, you’re 200 $1,000 in the hole.
Scott Peper 17:06
Yep,
Drew Aldridge 17:06
you’re constantly catching up. So that’s really really tough, really really tough to do when you’re trying to grow and scale a construction company when you have multiple jobs. And I know we have guys out there and gals out there that see jobs they want to do, they want to bid on them, but they don’t because they don’t have the cash to do it, or they do, and then something really tough happens.
Scott Peper 17:28
And GCs, by the way, those subs that are saying no to expanding, they’re the best subs performance wise. They’re the smartest ones. They they know they know that that job is going to get them in trouble because they don’t have the money, so they say no. Those are the subs you actually want with the right capitalization to be working on your projects. They know how to execute, and they also have a command of their numbers to know they don’t have enough money to get this job done. And therefore, no matter how well I can do my work, if I don’t have the money, I can’t execute the work to the same degree level.
Drew Aldridge 17:57
Yeah, I mean, some of the best subs that we’ve talked to, or that I personally, I can only kind of speak for myself here. Some of the best contractors that I know out there are the ones that fully understand and have identified and are at peace with what their constraints are. Notice I didn’t say weaknesses; I said constraints. And then they develop systems around those constraints in order for them to move forward and do more work, et cetera,
Scott Peper 18:21
and cash availability of cash is a constraint.
Drew Aldridge 18:25
Oh, yeah, constraint, bonding capacity, labor. I mean, there’s a there’s a number of constraints. But all right, Scott, I think I think we we did pretty well here. We did the three myths. I think we brought a brought a ton of information here. I appreciate your expertise. I think that’s a wrap here.
Scott Peper 18:42
Yeah, I would say our big takeaways are for GCs. First and foremost, measure your actual pay app timeline, not the term written in the contract. Evaluate your subs on capacity, labor plan, and funding plan, not the price alone. What can they Execute performance-wise with the best price, and then subs look submit clean complete pay apps on time. Figure out what the payment delays are are going to be, especially administratively, and help your project manager and your general contractor get through their process in the most beneficial, efficient manner, which means delivering them the exact information they are going to be required to deliver. If they have to figure it all out, it’s only going to add time, and you’re the only one that’s going to suffer for that, or at least you’re the one that’s going to suffer the most. And the last thing, price your cost of capital into every single bid you put out. One, you’re going to win more bids. Two, you’re going to execute better. Three, your price, your margin, and everything is going to work better for your business. And more importantly, if you don’t have the money before your project starts, then don’t do the job because you’re going to get tight, and it’s only going to hurt you down the long run and set you back years or months. What else, Drew?
Drew Aldridge 20:00
You just did a great summary. I mean, I have nothing to add to that. I usually have something to add, but I really don’t have anything to add up to that.
Scott Peper 20:07
All right, everybody, change your mindsets, GCs and subs. You guys are working together. You do not need to be at odds, and the best of the best actually operate exactly that way. Subs tell GCs what they need, GCs tell them what they can do, and they find common ground. In the meantime, you all have a great week, and may God bless you.

Ep Thumbnail

Episode 169 | The Q4 Playbook: What Contractors Should Do Now to Win 2027

A successful 2027 starts with the decisions you make before the year begins. In this episode of The Mobilization Mindset, Scott Peper and Drew Aldridge discuss how construction business owners can prepare for 2027 by taking an honest look at their operations, financial performance, and growth strategies. They explain why effective business planning starts with understanding what’s working, identifying what’s holding you back, and focusing on the decisions within your control.

They discuss:

– Why evaluating your current performance is the first step in planning for 2027

– How financial data, KPIs, and project-level cash flow can guide better business decisions

– Why contractors should focus on profitable work rather than simply increasing revenue

– How customer feedback, operational efficiency, and resource allocation influence growth

– Why accountability and execution are just as important as setting business goals

 

Whether you’re looking to grow your construction business, improve profitability, or strengthen your operations, this episode offers practical advice for building a more intentional business strategy heading into 2027.

Ep Thumbnail

Episode 168 | The Giving Mindset: Why the Best Businesses Play the Long Game

What if the best way to grow your business was to focus less on what you can get and more on what you can give? In this episode of The Mobilization Mindset, Scott Peper and Drew Aldridge discuss the lessons from The Go-Giver and how its principles have shaped the culture and core values at Mobilization Funding.

They explore how leading with value, building authentic relationships, and putting others first can create opportunities for long-term business success.

They discuss:

The five laws of The Go-Giver and how they apply to business and leadership

Why providing value before expecting something in return builds stronger relationships

How authenticity can improve sales, trust, and customer experiences

What a giving mindset looks like in the construction industry

Why long-term partnerships are more valuable than individual transactions

Whether you’re a construction business owner, leader, or sales professional, this episode offers a different perspective on building a business by focusing on the value you bring to others.

Ep Thumbnail

Episode 167 | Field Tested: Best Stories & Biggest Lessons from Scott & Herb

Some of the most valuable business lessons come from the mistakes you wish you could take back. In this episode of The Mobilization Mindset, Scott Peper sits down with Herb Sargent to give a preview of their new book, Field Tested. They share why they chose to tell the real stories behind their successes, failures, and hard earned lessons in construction and business, with the goal of helping the next generation of leaders avoid learning everything the hard way.

They discuss:

• Why learning from someone else’s mistakes can save years of pain

• How growing too quickly can expose weaknesses in your business

• Why business owners need to grow alongside their companies

• When hiring the right people can unlock the next stage of growth

• How better due diligence can prevent a great opportunity from becoming a costly mistake

Field Tested was created to help contractors and business owners learn from decades of real world experience and recognize that the challenges they’re facing have likely been faced by someone before them.

The goal isn’t to avoid every mistake, but to learn faster, make better decisions, and build a stronger business because of them.

Ep Thumbnail

Episode 166 | A Budget Your Construction Business Can Run On with Danielle Hayden

Profit doesn’t equal cash, and your CPA probably isn’t the right person to tell you what to do about it. Knowing your numbers is one thing. Knowing what to do with them is what helps you run a better business.

In this episode of The Mobilization Mindset, Drew Aldridge sits down with Danielle Hayden, CPA, CEO of Kickstart Accounting, and host of the CEO Numbers Network podcast, to discuss how business owners can build a stronger financial foundation and use their numbers to make better decisions.

They discuss:

• The different roles a bookkeeper, CPA, and CFO should play in your business

• When a fractional CFO makes sense, and when you might need one in-house

• How to turn your budget into a real decision-making tool instead of a document you rarely revisit

• Which financial KPIs to track, from revenue and gross margin to your top five operating expenses and cash trends

• Why profit and cash flow tell two very different stories, and where your cash hides on the balance sheet

Danielle also shares her take on QuickBooks, AI tools like ChatGPT, and why they can’t replace the CEO’s judgment or a clean set of books.

Ep Thumbnail

Episode 165 | Why Profitable Growth Still Breaks Cash Flow

A profitable construction business can still struggle with cash flow. Why? Because profit on paper isn’t the same as cash in the bank, and the gap usually starts at the job level.

In this episode of The Mobilization Mindset, Scott Peper and Drew Aldridge preview the upcoming Cash Flow Workshop with Ground Crew, happening October 21-22 in Tampa, Florida. They break down what contractors can expect from two days focused on improving construction cash flow, protecting job profitability, and understanding the financial decisions that impact growth.

Scott and Drew discuss:

• Why profitable construction companies can still experience cash flow problems

• How bidding, job margins, and expected vs. actual profit affect your bottom line

• How to manage labor costs when payroll stays steady but production dips

• How better job costing and cash flow forecasting support sustainable growth

• What attendees will learn from Herb Sargent, Benjamin Holmgren, Suzanne Bach, Scott Kimpland, and the Mobilization Funding team

The workshop brings together construction, accounting, finance, and operational perspectives, so contractors of all sizes and trades can see where their cash is going and what to do about it. Scott and Drew also preview lessons from Field Tested, the new book from Herb and Scott. It’s built around real business stories, mistakes, and practical steps construction leaders can use in their own companies.

Ep Thumbnail

Episode 164 | Construction Subcontractor Contract Terms That Protect Your Cash Flow

Some of the most powerful tools for improving cash flow don’t require borrowing more money. They start with your contract.

In this episode of The Mobilization Mindset, Scott Peper and Drew Aldridge break down how subcontractors can negotiate construction contracts with cash flow and risk in mind.

They discuss:

• How paid-if-paid and paid-when-paid terms can impact your cash flow• Why subcontractors should understand the GC’s agreement with the owner• How clearer payment and change order terms can prevent problems later• Strategies for managing retainage as your business grows• How the “Yes, If” method can create better outcomes during negotiations

If you’re a contractor looking to improve cash flow, reduce risk, and negotiate from a stronger position, this episode shows why some of your best opportunities may already be sitting inside your contract.

Ep Thumbnail

Episode 163 | The Legacy You Build Beyond Construction with Victor Bretting

In this episode of The Mobilization Mindset, Scott Peper sits down with construction executive and author Victor Bretting to reflect on the lessons he’s learned throughout five decades in the industry. From managing cash flow and navigating contractor relationships to developing as a leader and building a legacy, Victor shares the experiences that shaped his approach to construction and life.

They discuss:

– Why perseverance is essential in construction

– How forecasting and understanding cash flow can protect a growing contracting business

– What subcontractors can do to build stronger relationships with general contractors

– Why great leadership requires listening, learning, and serving others

– The importance of legacy, mentorship, and talking openly about mental health

Victor also shares the story behind his memoir, The Man I Would Become, and how writing about his life forced him to reflect on his successes, mistakes, relationships, and the kind of legacy he wants to leave behind.

Victor’s Website: https://brettingtexanranch.com/about

The Man I Would Become: https://brettingtexanranch.com/the-book

Ep Thumbnail

Episode 162 | Why Owners Get Stuck Between the 4 Stages of Leadership

Growing a business requires more than getting better at what you do. It requires becoming the leader your business needs next.

In this episode of The Mobilization Mindset, Scott Peper and Drew Aldridge explore the four stages of leadership: Operator, Founder, Manager, and Leader, and how business owners must learn to navigate each as their company grows.

They discuss:

– Why your business can only grow as far as you do as a leader

– The differences between being a founder, leader, manager, and operator

– Why leadership starts with learning to lead yourself

– How developing and empowering others creates room for growth

– Why letting go doesn’t mean others have to do things exactly your way